Hi Roong, I know it doesn't seem logical, but by making the size of the steps your motor is taking smaller will decrease the burn time.my latest was 12mm hole. and I can do it in 2 1/4 hour (The file was 7.5mm thick).
Thanks for that very interesting post. Can you post/point the schematics of the power supply you're referring to?the fact is that a proper pulse edm generator is very easy to build
They tried that where I worked, for a while. Works good in wire but not in sinkers. The sinkers produce so much debris it clogs the deionizing tanks, even if filtered first.it needs to be constantly deionised through deionising resin which is a pain,