Hypatia's Protege
- Joined Mar 1, 2015
- 3,228
... Or, to look at it another way, what fraction of the job does 'C' contribute over the entire 3 days?
i.e.
3*(1/6)+3*(1/8)+X=1
X=The fraction of the entire job attributable to 'C'
Get it?
i.e.
3*(1/6)+3*(1/8)+X=1
X=The fraction of the entire job attributable to 'C'
Get it?
Last edited: