Dump load installed. Now there are some standard resistance loads (down to 2.5 ohms) for internal battery resistance and State of Charge calculations.
They get pretty hot quickly during 10 second test sequences so I need to install a better heat-sink than plywood.
They get pretty hot quickly during 10 second test sequences so I need to install a better heat-sink than plywood.