I am a general contractor and within the governing documents of my project there is a general note indicating ED.
4. Electrical discontinuity between the carrier pipe and the casing or tunnel liner shall be verified at intervals no less than (1) test per joint of pipe. Contractor shall document each test.
A. How is this test performed
B. If there isn't ED how would you discharge the continuity
C. Is there a document to record this test
Note:
The casing is steel welded every 20' and the carrier pipe is C900 with carrier spacers by Recon ( rubber against the C900 and plastic legs to hold the C900 in the center of the casing ). Also this casing will be pressure grouted.
4. Electrical discontinuity between the carrier pipe and the casing or tunnel liner shall be verified at intervals no less than (1) test per joint of pipe. Contractor shall document each test.
A. How is this test performed
B. If there isn't ED how would you discharge the continuity
C. Is there a document to record this test
Note:
The casing is steel welded every 20' and the carrier pipe is C900 with carrier spacers by Recon ( rubber against the C900 and plastic legs to hold the C900 in the center of the casing ). Also this casing will be pressure grouted.