Scope Telequipment D61A;horizontal position fault

Thread Starter

patpin

Joined Sep 15, 2012
405
Please be advised that there are many other 'things' to examine/inspect -- howbeit I prefer a 'first things first' approach:cool:
HP:)
Hallo, been on the road yesterd. I think theoretically yr right preferring the step by step approach. But in this case (see picture) it is a delicate work to get the time div out, and I will naturally do it, but I would prefer that we can measure everything behind the time/div block in one session. Is there anything hidden aft that we can check/or measure while the block is out?
upload_2016-1-19_10-53-11.png
if you dont have the PCB layout I will post it. K.reg
 
Hallo, been on the road yesterd. I think theoretically yr right preferring the step by step approach. But in this case (see picture) it is a delicate work to get the time div out, and I will naturally do it, but I would prefer that we can measure everything behind the time/div block in one session. Is there anything hidden aft that we can check/or measure while the block is out?
View attachment 99016
if you dont have the PCB layout I will post it. K.reg
I apologize that I failed to correctly express myself -- I concur with your assessment that the difficulty attendant to removal of C56 is unwarranted at this time:) --- Hence, my suggestion that you measure the EMF across same (e.g. from the 'left end' of R124 to the chassis/ground):):):)

Best regards
HP:cool:
 
Last edited:

Thread Starter

patpin

Joined Sep 15, 2012
405
I apologize that I failed to correctly express myself -- I concur with your assessment that the difficulty attendant to removal of C56 is unwarranted at this time:) --- Hence, my suggestion that you measure the EMF across same (e.g. from the 'left end' of R124 to the chassis/ground):):):)

Best regards
HP:cool:
At the right of R124 11V; at the left 93V;
 
Note however that C56 is not entirely exonerated -- while ≈ 3.2mA is (IMO) consistent with anticipated current requirements, the Cap may, nonetheless, be 'open' -- (i.e. given the 'periodic' nature of the current demand, greater E(C56) might reasonably be expected) -- So one more test -- then we'll move on to other components for the nonce:

Please watch the EMF across C56 while the scope is functioning properly (during warm-up):)
 

Thread Starter

patpin

Joined Sep 15, 2012
405
Note however that C56 is not entirely exonerated -- while ≈ 3.2mA is (IMO) consistent with anticipated current requirements, the Cap may, nonetheless, be 'open' -- (i.e. given the 'periodic' nature of the current demand, greater E(C56) might reasonably be expected) -- So one more test -- then we'll move on to other components for the nonce:

Please watch the EMF across C56 while the scope is functioning properly (during warm-up):)
OK I let it cool down for 10 min. CU later.
 
@patpin

In case I'm (temporarily) absent when you've completed the 'warm-up test' -- please:

For the following tests only - Set the Time/Div control to 'EXT X' -- and the gain of the channel servicing the X-axis input to its lowest (i.e. least sensitive) range...


→'Re-take' the R80 & R56 measurements
Then ...
→The EMF across R64
→The EMF across R65
→The EMF across D55 (i.e. Ebe of TR26)
→The EMF from Test Point 'H' to the chassis


Please tabulate your results:)


Best regards
HP:)
 
Last edited:
Didnt showed baseline over full screen at startup this time. I guess cool down period wasnt long enough.. I let it cool down 1/2 u. in cooler room.
I may be away form my computer for a awhile --- So.. Once obtained, please post your results -- then proceed to the EMF measurements suggested in post #177

Best regards
HP:cool:
 

Thread Starter

patpin

Joined Sep 15, 2012
405
In case I'm (temporarily) absent when you've completed the 'warm-up test' -- please:

For the following tests only - Set the Time/Div control to 'EXT X' -- and the gain of the channel servicing the X-axis input to its lowest (i.e. least sensitive) range...


→'Re-take' the R80 & R56 measurements
Then ...
→The EMF across R64
→The EMF across R65
→The EMF across D55 (i.e. Ebe of TR26)
→The EMF from Test Point 'H' to the chassis


Please tabulate your results:)


Best regards
HP:)
NON- EXT-X ---------- EXT-X
R80 TOP 91.8 ---------- 91.2
R80 BELOW 67 ---------- 66.8
R56 BELOW 10.3 ---------- =
over R64 -1.7 ---------- =
over R65 -9.7 ---------- =
over D55 0.6 ---------- =
point H -7.8 ---------- +1.3

The warmup phase with full screen did not occured even after 2h cooling.
k.reg (tabulator is mistery for me...functions when edited but not when published)
 
Last edited:
tabulator is mistery for me...functions when edited but not when published
That's because the character pitch used in the 'editor' differs from that of posted text --- No problem!:):):)

over R64 -1.7 ---------- =
over R65 -9.7 ---------- =
Please identify the position of the positive probe while taking each of the above readings...


Very best regards
HP:)


PS what does "K.Reg" mean?:confused:
 
Top