Hi All,
I am using for ex: IRFML8244TRPBF as a MOSFET and trying to figure maximum on time and required off time (duty cycle) when pulsing 20A into a load. Would anyone be able to provide examples or direction on calculating these values?
Thanks,
Kevin
I am using for ex: IRFML8244TRPBF as a MOSFET and trying to figure maximum on time and required off time (duty cycle) when pulsing 20A into a load. Would anyone be able to provide examples or direction on calculating these values?
Thanks,
Kevin