Hi, I'm looking for a way to create a delay switch for the water supply to my furnace (boiler).
I need something that applies power to a normally open solenoid valve, closing the valve while the furnace runs, and keeps power to the solenoid
5-10 minutes after the furnace ends its cycle, power off. I can get the on off signal from the furnace control and 120 VAC from an external source.
Thank you
I need something that applies power to a normally open solenoid valve, closing the valve while the furnace runs, and keeps power to the solenoid
5-10 minutes after the furnace ends its cycle, power off. I can get the on off signal from the furnace control and 120 VAC from an external source.
Thank you