Put Utah on the list of growing manufacture of electronics and software design. I think it’s all about the newest automation processes, put X into building Y comes out ready to ship. I remember when GE designed a facility that made dishwashers, parts come in dishwashers come out, most of the process is human less. Load on a truck gone. Shipping weights also decreases as machine designs favored cost of shipping over long term use. We entered into the throw away vs repair, designed obsolescence. Put me out of business when Clinton deregulated Banks opening a new era of Lone term credit for Big Box stores to sell cheap hard goods to customers willing to put the <ars> on the line for it and go bankrupt if they couldn’t meet the Loan payment. Such as they did during the housing bust.The governor of Arizona knows the score.
There will be at least 2 years of heavy industrial work building out the fab and tons of engineering/technical/facilities staff that can't be automated away. What's lost are the lowest playing operator jobs shuffling wafers from workstation to workstation.
Oh, well or c’est la vie. I’m still the better for it, letting that business go was difficult but, one of the best decisions I’ve ever had to make, I lost around 40k in the process but grew my knowledge far above what I would have staying stubborn and poor.
kv



