MaxHeadRoom
- Joined Jul 18, 2013
- 30,726
The transformer should have a plate with primary and secondary voltages.
Measure between each of the two phases available and hook up the transformer accordingly,
If you measure 415v, then connect between 0v and 415v.
Max.
Measure between each of the two phases available and hook up the transformer accordingly,
If you measure 415v, then connect between 0v and 415v.
Max.