this is basic Q, if i have 12v lead acid batt that is at exactly 12v (basically depleted) and i attach a charger to recharge the batt, the charger must be at a higher voltage then the batt so amps (energy) flow into the batt. question is, when you attach the charger leads to batt and then put a voltage meter on the terminals, does the meter read batt voltage (increasing over time as the batt charges) or does the meter read the charger open circuit voltage?