Just my thoughts on this. Unless you are needing the 3PH every day or even every week, owning something and then having to keep it up seems kind of a waste. If only needing the high power 3PH once a month or less, wouldn't it make more sense to rent a portable gen set when needed? The cost could then be offset by, 1. charging the customer, and 2. writing it off your taxes at the end of the year as a necessary expense. The every day testing of the single phase control system could be run from the available mains. With the 3PH part being controlled by a smaller RPC, at reduced loads.
More information on the different RPCs store bought and DIY than you will ever need. It even has the origins of the so called miller system, before there was a miller system. The RPC he copied. http://www.practicalmachinist.com/vb/transformers-phase-converters-and-vfd/
More information on the different RPCs store bought and DIY than you will ever need. It even has the origins of the so called miller system, before there was a miller system. The RPC he copied. http://www.practicalmachinist.com/vb/transformers-phase-converters-and-vfd/




