4 layer board
Top layer = RED
inner 1 = GROUND
inner 2 = GROUND
Bottom layer = BLUE
Green Route or White Route
Green Route goes under IC and I dont know if that will cause problems or interact with the ground vias under the ic in any way when the spi signals return through them
White Route goes under my RF Trace and I dont know if any RF waves going through vias could somehow couple their way into the power trace/
Top layer = RED
inner 1 = GROUND
inner 2 = GROUND
Bottom layer = BLUE
Green Route or White Route
Green Route goes under IC and I dont know if that will cause problems or interact with the ground vias under the ic in any way when the spi signals return through them
White Route goes under my RF Trace and I dont know if any RF waves going through vias could somehow couple their way into the power trace/
Attachments
-
558.1 KB Views: 5
