Protection Co-ordination Study

Thread Starter

AllanSpencer

Joined Dec 6, 2018
2
Hello all!

I am currently working on a protection coordination study and am stuck on a few questions. I have done all required calculations but am struggling with answering the analysis questions.

Georgian T1 (Full load)=875A
Georgian T1 (inrush)=10500A
25X damage (2 sec)=21875A
10X damage (9.5 sec)=8750A
Customer Transformer (Full load)=65.61A
Customer Transformer (inrush)=787.32A
25X damage (2 sec)=1640.25A
10X damage (9.5 sec)=656.1A
Georgian B1 bus fault=10934.66A
Customer T2 HV bushing fault=1250A

For the following cases discuss reliability and selectivity.

-Customer full load
-Faults at the end of the feeder
-Faults at the recloser
-Georgian transformer full load current
-Georgian TS and customer transformer inrush current

Any help with regards to discussing reliability and selectivity in regards to the given information would be greatly appreciated.
 

Attachments

Top