I have a customer who run a site that has many many AC motors of varying sized. When the larger ones start the inrush current is so much that it sets the utility rates for the month. Is there a way of using flywheel technology to assist in offsetting the facility’s peak current loads and therefore reducing the peak demand charges they currently experience?