Hi guys - looking for some advice
I want to add an additional starting circuit to my generator by splicing into the original circuit
here is the wiring
the genny is outside the garage and that is controlled by its original circuit, so i want an additional circuit inside the garage to save the bother of going outside, especially because it rains a lot here, and im lazy.
ideally i want both circuits operational (at least for stopping the genny) in case something goes wrong, i believe this is just a case of grounding the ignition control but hey - this is why im here!
i have some 10a and 40a (5 pin) relays and some toggle switches which may do the switching or do i need something more elaborate?
anyway thank for any advice
I want to add an additional starting circuit to my generator by splicing into the original circuit
here is the wiring
the genny is outside the garage and that is controlled by its original circuit, so i want an additional circuit inside the garage to save the bother of going outside, especially because it rains a lot here, and im lazy.
ideally i want both circuits operational (at least for stopping the genny) in case something goes wrong, i believe this is just a case of grounding the ignition control but hey - this is why im here!
i have some 10a and 40a (5 pin) relays and some toggle switches which may do the switching or do i need something more elaborate?
anyway thank for any advice
Last edited: