I am replacing a mech timer with an elec timer and can't get it to work.
I have wired the red to the load and black to the line, green to a group of white wires all nutted together and the white from the timer to a group of pure copper wires (without insulation) which is tied to the side of the light switch next to the timer.
I switched the green and white with no results.
I noticed that the white wires sparked when I put a multimeter on them.
I put a Multimeter across the load and line wire and got 121 V.
When I touched the white wires with a single lead it sparked fairly vigorously so I didn't go any further.
I have a picture of the original wiring if that would help.
It's too large to post to this site.
I had to have an electrician rewire a 4 plug socket somewhere else in the house because it never worked.
He said the person who wired the house didn't know what they were doing.
I told him that was funny because it was a licensed electrician who built the house.
He told me I will most likely find some nonstandard wiring in other places as I remodel.
I have wired the red to the load and black to the line, green to a group of white wires all nutted together and the white from the timer to a group of pure copper wires (without insulation) which is tied to the side of the light switch next to the timer.
I switched the green and white with no results.
I noticed that the white wires sparked when I put a multimeter on them.
I put a Multimeter across the load and line wire and got 121 V.
When I touched the white wires with a single lead it sparked fairly vigorously so I didn't go any further.
I have a picture of the original wiring if that would help.
It's too large to post to this site.
I had to have an electrician rewire a 4 plug socket somewhere else in the house because it never worked.
He said the person who wired the house didn't know what they were doing.
I told him that was funny because it was a licensed electrician who built the house.
He told me I will most likely find some nonstandard wiring in other places as I remodel.