Need sanity check here.. (Already saw flames/sparks and don't want to again..oops)
Long weekend blah blah blah.. I'm tired..
Do I have this wiring correct?
Actuation of Foot switch will energize Solenoid 1 for 5 seconds and then solenoid 2 will start 1/2 second after that and both will stop after the 5 second time has elapsed..
Using these relays..
https://www.mcmaster.com/#timer-relays/=1a51x90
Long weekend blah blah blah.. I'm tired..
Do I have this wiring correct?
Actuation of Foot switch will energize Solenoid 1 for 5 seconds and then solenoid 2 will start 1/2 second after that and both will stop after the 5 second time has elapsed..
Using these relays..
https://www.mcmaster.com/#timer-relays/=1a51x90