I have an overhead crane rail/bridge system, with 4 crane rails, 3 bridges, and 2 hoists. This afternoon, one of the crane rails decided to stop working at correct speed in the north travel, only. The south travel runs at full speed. All 3 other crane rails run perfectly north/south as well.
I am thinking it could be a plc issue, but I'm not sure. Any help would be appreciated.
Thank you in advance,
Tom
I am thinking it could be a plc issue, but I'm not sure. Any help would be appreciated.
Thank you in advance,
Tom