The Electric Journal, Volume 14, Number 5, May 1914
Westinghouse Club
Copyright 1917
http://books.google.com/books?id=CjAyAQAAMAAJ&pg=PA1
Quote from page 1:
The outstanding feature of the year 1916 as compared with the previous one is the remarkable change in the operating conditions of both the public service corporations and the electrical manufacturing concerns.
During 1915 a wave of economy and retrenchment swept over the entire central station industry; while the past year has witnessed such tremendous increases in loads that even some of the very large power companies were unable to furnish service when requested, and in a few cases it became necessary for industrial establishments to arrange for their own supplementary power supply.
An interesting result of this condition was the case of two large power companies covering adjoining territories whose peak loads came at different times of the day and who arranged for an interchange of power. In this way each company was enabled to take on about 10,000 horse power additional that would have been impossible if each distribution system had been operated separately.
Last year the largest turbogenerator unit was one having a rating of 47,000 kva, which had been ordered by the Duquesne Light Company of Pittsburgh. Progress in this branch of the industry continues very actively and the same company is now in the market for a unit rated at 70,800 kva. The Interborough Rapid Transit Company, of New York, have also ordered a 60,000 - 70,000 kva unit.
These extremely rapid increases have been accompanied by corresponding developments in condensers, boilers, and furnaces, and enormous economies are being secured by the use of these immense units.
For instance, in 1900 a number of 5,000 kw units installed in New York cost over forty dollars per kilowatt, whereas units of 30,000 kw and over have recently been installed for nine dollars per kilowatt including condensers.
In addition to the reduction in investment cost, it has been found possible in a number of cases to install these large units in the same space occupied by older and smaller capacity outfits, and in some cases no increase was necessary in boiler space by reason of the greatly improved methods of steam generation now in use.
Economies have been increased from three pounds of coal per kilowatt hour for some of the early machines to one and one half pounds per kilowatt hour for the modern turbines. These facts readily explain why the larger power companies cannot afford to continue running some of their older apparatus.
[...]
Westinghouse Club
Copyright 1917
http://books.google.com/books?id=CjAyAQAAMAAJ&pg=PA1
Quote from page 1:
The outstanding feature of the year 1916 as compared with the previous one is the remarkable change in the operating conditions of both the public service corporations and the electrical manufacturing concerns.
During 1915 a wave of economy and retrenchment swept over the entire central station industry; while the past year has witnessed such tremendous increases in loads that even some of the very large power companies were unable to furnish service when requested, and in a few cases it became necessary for industrial establishments to arrange for their own supplementary power supply.
An interesting result of this condition was the case of two large power companies covering adjoining territories whose peak loads came at different times of the day and who arranged for an interchange of power. In this way each company was enabled to take on about 10,000 horse power additional that would have been impossible if each distribution system had been operated separately.
Last year the largest turbogenerator unit was one having a rating of 47,000 kva, which had been ordered by the Duquesne Light Company of Pittsburgh. Progress in this branch of the industry continues very actively and the same company is now in the market for a unit rated at 70,800 kva. The Interborough Rapid Transit Company, of New York, have also ordered a 60,000 - 70,000 kva unit.
These extremely rapid increases have been accompanied by corresponding developments in condensers, boilers, and furnaces, and enormous economies are being secured by the use of these immense units.
For instance, in 1900 a number of 5,000 kw units installed in New York cost over forty dollars per kilowatt, whereas units of 30,000 kw and over have recently been installed for nine dollars per kilowatt including condensers.
In addition to the reduction in investment cost, it has been found possible in a number of cases to install these large units in the same space occupied by older and smaller capacity outfits, and in some cases no increase was necessary in boiler space by reason of the greatly improved methods of steam generation now in use.
Economies have been increased from three pounds of coal per kilowatt hour for some of the early machines to one and one half pounds per kilowatt hour for the modern turbines. These facts readily explain why the larger power companies cannot afford to continue running some of their older apparatus.
[...]