HP DL380 Linux Desktop

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Power bill? I have an electric heater computer rack (less peak power than a conventional electric heater) for the 2 car garage. It get's cold here. In the summer I use solar power to keep the critical system UPS charged. The computer rack is the primary load for my solar energy bank.
Upgrading the server farm/cooling off-grid system with another 800W of panels. Ground testing 4 panels before being mounted.
1685044891958.png


Now I need to upgrade the 12vdc backbone to a much larger gauge wire. The losses are horrible.
At the Panels.
1685044945509.png

At the inverter monitor at full cooling load.
1685045001130.png

Loads off, just recharging the battery bank.
1685045073939.png
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
I have a blinking amber light today on one drive. All raid logical drives are good.

root@hp:/public# hpssacli "ctrl all show config"
Smart Array P410i in Slot 0 (Embedded) (sn: 5001438012405C10)


Port Name: 1I

Port Name: 2I

Internal Drive Cage at Port 1I, Box 1, OK

Internal Drive Cage at Port 2I, Box 1, OK
array A (SAS, Unused Space: 0 MB)


logicaldrive 1 (410.1 GB, RAID 5, OK)

physicaldrive 1I:1:1 (port 1I:box 1:bay 1, SAS, 146 GB, OK)
physicaldrive 1I:1:2 (port 1I:box 1:bay 2, SAS, 146 GB, OK)
physicaldrive 1I:1:3 (port 1I:box 1:bay 3, SAS, 146 GB, OK)
physicaldrive 1I:1:4 (port 1I:box 1:bay 4, SAS, 146 GB, OK)

array B (SAS, Unused Space: 0 MB)


logicaldrive 2 (410.1 GB, RAID 5, OK)

physicaldrive 2I:1:5 (port 2I:box 1:bay 5, SAS, 146 GB, OK)
physicaldrive 2I:1:6 (port 2I:box 1:bay 6, SAS, 146 GB, OK)
physicaldrive 2I:1:7 (port 2I:box 1:bay 7, SAS, 146 GB, OK)
physicaldrive 2I:1:8 (port 2I:box 1:bay 8, SAS, 146 GB, Predictive Failure)

SEP (Vendor ID PMCSIERA, Model SRC 8x6G) 250 (WWID: 5001438012405C1F)

physicaldrive 2I:1:8
Port: 2I
Box: 1
Bay: 8
Status: Predictive Failure
Drive Type: Data Drive
Interface Type: SAS
Size: 146 GB
Drive exposed to OS: False
Native Block Size: 512
Rotational Speed: 10000
Firmware Revision: HPDC
Serial Number: 3NM1BA2H00009728ZZA1
Model: HP DG146ABAB4
Current Temperature (C): 28
Maximum Temperature (C): 47
PHY Count: 1
PHY Transfer Rate: 3.0Gbps
Sanitize Erase Supported: False
Predictive Failure! Ordered a couple of spare drives to replace it. The array will rebuild automatically when the fresh drive is installed.
 

djsfantasi

Joined Apr 11, 2010
9,163
I have a blinking amber light today on one drive. All raid logical drives are good.

root@hp:/public# hpssacli "ctrl all show config"


Predictive Failure! Ordered a couple of spare drives to replace it. The array will rebuild automatically when the fresh drive is installed.
Loved the DL380

They were the backbone to f our backend database systems.
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Loved the DL380

They were the backbone to f our backend database systems.
I've had nothing but good with this series DL380 and DL360 up the GEN9 on the surplus market.

uprecords
# Uptime | System Boot up
----------------------------+---------------------------------------------------
1 74 days, 10:20:24 | Linux 5.15.0-rc1+ Sat Sep 25 11:49:41 2021
2 70 days, 00:03:38 | Linux 5.11.0-rc6+ Sat Feb 6 14:11:14 2021
3 69 days, 19:02:27 | Linux 5.16.0-rc4+ Wed Dec 8 21:14:31 2021
4 54 days, 18:18:58 | Linux 5.12.0+ Sat May 1 21:58:07 2021
5 54 days, 01:30:04 | Linux 4.19.0-3-amd64 Wed Feb 27 17:02:29 2019
6 53 days, 13:00:30 | Linux 6.1.0-7-amd64 Sun Apr 16 18:53:29 2023
7 52 days, 18:00:31 | Linux 6.0.0-2-amd64 Fri Nov 4 13:54:09 2022
8 50 days, 23:45:27 | Linux 5.8.0-1-amd64 Wed Sep 16 20:16:27 2020
9 41 days, 22:22:31 | Linux 5.12.0+ Wed Aug 4 17:15:08 2021
10 40 days, 11:07:11 | Linux 5.19.0-1-amd64 Thu Sep 15 21:43:32 2022
----------------------------+---------------------------------------------------
-> 13 37 days, 02:12:32 | Linux 6.5.0-2-amd64 Thu Oct 19 15:08:38 2023
----------------------------+---------------------------------------------------
1up in 0 days, 02:10:45 | at Sat Nov 25 18:31:55 2023
t10 in 3 days, 08:54:40 | at Wed Nov 29 01:15:50 2023
no1 in 37 days, 08:07:53 | at Tue Jan 2 00:29:03 2024
up 1816 days, 00:18:44 | since Wed Oct 31 22:27:57 2018
down 34 days, 18:34:29 | since Wed Oct 31 22:27:57 2018
%up 98.121 | since Wed Oct 31 22:27:57 2018
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Popped out the old and in with the new -> auto-rebuild raid. Computer never skipped a beat.

physicaldrive 2I:1:8
Port: 2I
Box: 1
Bay: 8
Status: OK
Drive Type: Data Drive
Interface Type: SAS
Size: 146 GB
Drive exposed to OS: False
Native Block Size: 512
Rotational Speed: 15000
Firmware Revision: HPDD
Serial Number: PLYL2KJE
Model: HP EH0146FARWD
Current Temperature (C): 23
Maximum Temperature (C): 49
PHY Count: 2
PHY Transfer Rate: 6.0Gbps, Unknown
Sanitize Erase Supported: False


root@hp:/var/log# hpssacli ctrl slot=0 ld 2 show

Smart Array P410i in Slot 0 (Embedded)

array B

Logical Drive: 2
Size: 410.1 GB
Fault Tolerance: 5
Heads: 255
Sectors Per Track: 32
Cylinders: 65535
Strip Size: 256 KB
Full Stripe Size: 768 KB
Status: OK
Caching: Enabled
Parity Initialization Status: Initialization Completed
Unique Identifier: 600508B1001C30A4D1E4794D85FD4904
Disk Name: /dev/sda
Mount Points: /sdb 410.1 GB Partition Number 2
OS Status: LOCKED
Drive Type: Data
LD Acceleration Method: Controller Cache
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
After 5 years it's time to refresh the main server rack redundant UPS system battery. For servers with redundant power supplies there are individual UPS systems for each power supply. All other networking and systems on the rack are powered from one or the other UPS for load leveling.
This guy is online with the full load while the other UPS is getting serviced with new batteries and cooling fans.
1701912258792.png
https://www.amazon.com/product-reviews/B08511TB6H
A slight redesign of this UPS: https://www.amazon.com/CyberPower-PR1500LCD-Sinewave-Outlets-Mini-Tower/dp/B0083TXNMM/?th=1
That's the UPS version I use on the server to monitor UPS condition.
upsc UPS1
Init SSL without certificate database
battery.charge: 100
battery.charge.low: 20
battery.charge.warning: 40
battery.mfr.date: CPS
battery.runtime: 4290
battery.runtime.low: 300
battery.type: PbAcid
battery.voltage: 24.0
battery.voltage.nominal: 24
device.mfr: CPS
device.model: ACMT1500
device.serial: FCMNQ2000297
device.type: ups
driver.flag.ignorelb: enabled
driver.name: usbhid-ups
driver.parameter.offdelay: 60
driver.parameter.ondelay: 0
driver.parameter.pollfreq: 30
driver.parameter.pollinterval: 15
driver.parameter.port: auto
driver.parameter.synchronous: auto
driver.version: 2.8.0
driver.version.data: CyberPower HID 0.6
driver.version.internal: 0.47
driver.version.usb: libusb-1.0.26 (API: 0x1000109)
input.frequency: 60.0
input.voltage: 121.1
input.voltage.nominal: 120
output.frequency: 60.0
output.voltage: 121.1
ups.beeper.status: enabled
ups.delay.shutdown: 60
ups.delay.start: 0
ups.load: 25
ups.mfr: CPS
ups.model: ACMT1500
ups.productid: 0601
ups.realpower.nominal: 1100
ups.serial: FCMNQ2000297
ups.status: OL
ups.test.result: No test initiated
ups.timer.shutdown: -60
ups.timer.start: -60
ups.vendorid: 0764
This guy is old--school heavy iron.
1701912309895.png1701913279219.png1701912458022.png
https://www.kesintisizservis.com/pdf/MGE/MGE_UPS_PULSAR_EX30_manual.pdf
ON LINE MODE which is the primary
mode of operation in which the critical load
is continuously supplied by the inverter and
protected from all forms of power line
disturbances:
1701912500877.png
~1A loading battery bank at 86V. High internal resistance, they are shot.

New set of 8 12V 8Ah SLA batteries installed.
1701912666763.png

Much better under load.
1701912731494.png
Replace those old fans and she's as good as new. :)
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Reinstalled the UPS.

upsc mge_sma2
Init SSL without certificate database
battery.charge: 100.0
battery.charge.low: 20
battery.runtime: 05400
battery.voltage: 109.0
battery.voltage.nominal: 096.0
device.mfr: MGE UPS SYSTEMS
device.model: Pulsar EX 30
device.type: ups
driver.name: mge-utalk
driver.parameter.pollinterval: 20
driver.parameter.port: /dev/ttyS0
driver.parameter.synchronous: auto
driver.version: 2.8.0
driver.version.internal: 0.94
input.frequency: 61.00
input.voltage: 127.1
output.current: 000.0
output.voltage: 120.4
ups.delay.shutdown: 120
ups.delay.start: 000
ups.firmware: 5
ups.id: Pulsar EX30 5
ups.load: 000.0
ups.mfr: MGE UPS SYSTEMS
ups.model: Pulsar EX 30
ups.status: OL CHRG
ups.test.interval: 10080

The old fan bearing were dust.
1701927682804.png1701927713720.png
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Upgrading the house backbone network to 10GB. Adding new 6 new CAT6 cables and keeping the old CAT5 network as a lower speed backup and sensor backbone.

Upstairs wire closet with access to the attic and workshop.
1701983038111.png
1701983058729.png
PVC conduit bulkheads that are sealed with fire-stopper putty when done.
https://www.3m.com/3M/en_US/p/d/b40070017/
1701983076858.png

1701983145890.png
Heating double walled vent pipe, whole-house vacuum port, AV, RF, digital signal cables and 220VAC transformer isolated media room power-feed and sub-panel. Yes it's a mess inside but

1701983182410.png
it's hidden.
 

joeyd999

Joined Jun 6, 2011
5,287
Upgrading the house backbone network to 10GB. Adding new 6 new CAT6 cables and keeping the old CAT5 network as a lower speed backup and sensor backbone.

Upstairs wire closet with access to the attic and workshop.
View attachment 309408
View attachment 309409
PVC conduit bulkheads that are sealed with fire-stopper putty when done.
https://www.3m.com/3M/en_US/p/d/b40070017/
View attachment 309410

View attachment 309411
Heating double walled vent pipe, whole-house vacuum port, AV, RF, digital signal cables and 220VAC transformer isolated media room power-feed and sub-panel. Yes it's a mess inside but

View attachment 309412
it's hidden.
You're just...

...weird.
 

Thread Starter

nsaspook

Joined Aug 27, 2009
13,315
Server end terminated.
1702000210674.png1702000268395.png
CAT6 cables from above into PVC conduit routed over to the terminal plate.
1702000293838.png
Keystone holder from punching the wring down.
1702000320691.png1702000346268.png
1702000603780.png
Just need to screw the metal electrical box on the wood panel so I can run patch cords to the jacks from the 10G switch once the other ends are done and testing/labeling is finished.
My two sons are going to do the room terminations. It's Miller Time for me.
 
Top