I am currently working on a project to feed electrical output from an energy centre into 11kV ring main and distribute power to different consumers. Since the electrical output from the energy centre is over 10MW then the 11KV network needs to be upgraded to 33kV network. To prevent this I am considering of installation of a new 11KV network to feed power to 5 sites and the energy centre could be connected to multiple 11KV ring mains. I was wondering what strategy/electrical equipment require to install new 11KV network and interface the energy centre into all 11KV networks. Could anyone please explain about the control strategy of how power will be distributed to each site so a specific proportion could be transmit to specific site?
Thank you