PLC: Hydroponic System

Thread Starter

QA1311

Joined Dec 26, 2019
7
IMG_2861.jpg

Figure 48 shows an automated hydroponics system. A PLC will be used to provide the following sequence of light and nutrient. The PLC has a 10-ms timer tick time, and the maximum count of timer and counters is 9999.
1. The growing vat must have light of minimum intensity for at least 8 hours. A photo-switch, which closes on rising light level, monitors natural light during this period. If the light intensity falls below the switch level for more than 10 minutes, an artificial light is turned on until the natural light brightens again.
2. During the 8-hour light period, nutrient must be cycled into the vat every 2 hours and left for 2 hours. Nutrient is filled to L1 (closes on rising level) and emptied to L2 (opens with dropping level).
3. During the remaining 16 hours, nutrient is pumped in, left for 3 hours, pumped out and left out for 1 hour, cycling for the 16 hours.
Can you please help me find the ladder diagram? I'm using Rslogix 500 to simulate this system.
 

Attachments

MaxHeadRoom

Joined Jul 18, 2013
30,658
Have you looked at using a Smart Relay for this project? These should have enough I/O for that project and most include a 24h real time clock.
Ah, I see it is Homework so are you committed to RSlogix?
Max.
 
Top