How I calculate and pick the one I needMuch depends on the voltage/current/load characteristics for a soft start kind of set up.
Max.
It is resistive load , 10kw , input is 3 phase 220v and output is 45v 10kw and I use full bridge topologyI am assuming from the OP question that you require a power-on surge time delay, if so you need to state your anticipated load, the type and the application?