MOV and Thermistor design guide

MaxHeadRoom

Joined Jul 18, 2013
28,702
I am assuming from the OP question that you require a power-on surge time delay, if so you need to state your anticipated load, the type and the application?
Max.
 

Thread Starter

karas

Joined Sep 8, 2011
211
I am assuming from the OP question that you require a power-on surge time delay, if so you need to state your anticipated load, the type and the application?
Max.
It is resistive load , 10kw , input is 3 phase 220v and output is 45v 10kw and I use full bridge topology
 

MaxHeadRoom

Joined Jul 18, 2013
28,702
10Kw and you are hoping to do it with a MOV/Thermistor set up???:eek:
If the 10Kw is able to be sectioned, rather than a single load, then is it possible to do some kind of series parallel arrangement to bring it on line or?
Max.
 