As soon SW (connected at C1) pushed by user Relay 1 and 2 operate and existing NC became open . and follow below rules
1. Relay remain open even SW released
2. Even if power cut and resume relay keep maintain open connection ( it is ok if power is off relay resume to NC)
3. There should be some reset switch by pressing that relay will be normal to NC.
1. Relay remain open even SW released
2. Even if power cut and resume relay keep maintain open connection ( it is ok if power is off relay resume to NC)
3. There should be some reset switch by pressing that relay will be normal to NC.
Attachments
-
232.7 KB Views: 6
-
23.6 KB Views: 8