An electrical customer, with an estimated single phase load of 10.8-kva and 85% power factor, is to be supplied by a utility system's 7.2nd/120-v, single phase transformer.. Primary voltage is 7.2-kv and secondary voltage is 120v...I need the APp,APs,Is,Ip,TPs,TPp