Dear all, I have technoelectric motorized change over switch. currently they are using manually but boss want something automatic. My questions
1. I have googled but cant find how to wire the control circuit to use it automatically so help me hear
2. Do I need dedicated power supply for the motorize change over switch or can I tap either from the grid line or generator line?
3. What worst possible mistake and consequence can come?
The motorized change over is technoelectric type CS5 I have attached the picture and the data sheet please refer page 15 left side schematics for control terminals
1. I have googled but cant find how to wire the control circuit to use it automatically so help me hear
2. Do I need dedicated power supply for the motorize change over switch or can I tap either from the grid line or generator line?
3. What worst possible mistake and consequence can come?
The motorized change over is technoelectric type CS5 I have attached the picture and the data sheet please refer page 15 left side schematics for control terminals
Attachments
-
2 MB Views: 18
-
3.1 MB Views: 32