Hello all
I am working on 3K phase shift Fullbridge converter here Iam getting softswitching in the primary and in the secondary I am using Diode rectification and Iam getting around 85% efficiency at 1Mhz But I would like to replace these Diodes with MOSFETS to improve the efficiency. How can i give the timing for Synchronous MOSFETS when it is operating in Phase shift mode?
Here I am attaching the timing diagram which i followed
Thank you
I am working on 3K phase shift Fullbridge converter here Iam getting softswitching in the primary and in the secondary I am using Diode rectification and Iam getting around 85% efficiency at 1Mhz But I would like to replace these Diodes with MOSFETS to improve the efficiency. How can i give the timing for Synchronous MOSFETS when it is operating in Phase shift mode?
Here I am attaching the timing diagram which i followed
Thank you
Attachments
-
68.8 KB Views: 152