prairiemystic
- Joined Jun 5, 2018
- 307
ESD damage can take weeks to show up - 2N7000's were eventually sent to Vishay for failure analysis. The products ran fine for about 2 weeks. Conclusion is the parts were likely damaged during pcb assembly and test handling. Not all companies have proper ESD control, you know conductive floor wax, foot straps etc.