Hi Guys!
Sorry for asking such a strange question, but perhaps sonne has dealt with blind vias. Could you please tell me, if I have, say a buried via going from layer 2 to 3, and I have a blind via going from layer 1 to 2. Can I draw the 1-2 via right on top of the 2-3 one? Or I should move them away from each other?
Sorry for asking such a strange question, but perhaps sonne has dealt with blind vias. Could you please tell me, if I have, say a buried via going from layer 2 to 3, and I have a blind via going from layer 1 to 2. Can I draw the 1-2 via right on top of the 2-3 one? Or I should move them away from each other?