...be activated by one(1) NO MC switch (represented by RL1 and RL2) closing , thus energizing two(2) relays with independent timed on/off cycles, using as few additional components as necessary.
Edit: I guess I should include the timings. 1st relay energizes as soon as possible, so on in 2µ sec. then off in 999,998 µsec for a total of 1 sec cycle time. 2nd relay as shown (delay for 1 sec then off after 1 sec).
TIA,
JC
Edit: I forgot a junction dot on schematic where 12V power rail splits to feed both pin 4's of 555's
Edit: I guess I should include the timings. 1st relay energizes as soon as possible, so on in 2µ sec. then off in 999,998 µsec for a total of 1 sec cycle time. 2nd relay as shown (delay for 1 sec then off after 1 sec).
TIA,
JC
Edit: I forgot a junction dot on schematic where 12V power rail splits to feed both pin 4's of 555's
Attachments
-
8.3 KB Views: 28
Last edited: